Make every won rate explain its scope.
Keep source, date, units and included services visible in a construction rate register.
A price in KRW is useful only when its unit and scope are clear. A delivered material rate, a collection price and an installed work rate may cover different things. Avoid comparing the totals until their basis is understood.
Keep a dated rate register
Record material description, specification, quoted unit, currency, supplier reference, quotation date and validity. Identify delivery, unloading, installation and tax treatment as stated in the quotation. Keep uncertain items marked for confirmation.
Normalize package sizes
A tile rate per box needs the box coverage before it can be compared with a rate per m². A block price needs the product module and specification. A concrete rate needs the required product and service conditions. Use one comparison basis before selecting an offer.
Review labor and site conditions
For renovation or fit-out work, access, handling routes, preparation and work sequence can affect the estimate. Use project-specific assumptions for crews, equipment and working days. A material subtotal is not the whole installed cost.
Test the rate sensitivity
For 12.60 m³ of concrete, increasing an example rate from ₩100,000 to ₩110,000/m³ adds ₩126,000 to the material subtotal. The calculation exposes the effect of one input. It does not predict price movements or promise savings.
TB supports editable rates and reviewable assumptions. Its rate importer reviews data supplied by the user; it does not include a commercial Korean rate database or establish permission to use a supplied dataset.